Summary
When a hangar door failed at Capital City Airport in PA, the consequences were nearly tragic. The collapsed door almost struck the chief pilot and left the aviation department without a safe, reliable solution to protect their aircraft and facility. Winter was approaching, and the company needed a quick turnaround. Knowing time was critical, the chief pilot turned to Para-Port for a fast and dependable outcome.
Problem
Safety Risk The existing door collapsed in late-summer 2024, nearly injuring the chief pilot. | Urgency With winter approaching, the company feared frozen pipes and damaged equipment if a new door was not installed quickly. | Industry delays Industry delays |
The company needed a safe, reliable, and immediate solution built to last decades.
Solution
Para-Port responded quickly and coordinated with experienced hangar modification contractor Chiles Contracting. Chiles Contracting organized the trades and, with Para-Port Doors, completed the retrofit on an accelerated timeline.
Timeline
| September 2024 | Company reached out to Para-Port Doors |
| October 22, 2024 | Engineering began with Chiles Contracting's first site visit. |
| November 15, 2024 | Permits approved. Demolition, steelwork, and electrical work began. |
| December 16, 2024 | Para-Port team members Blaque and Trever arrive on-site with the door solution. |
| December 19, 2024 | The new Para-Port Door was installed and fully operational. |

Insights
Para-Port® Doors LLC
226 Heritage Drive
Tiffin, OH 44883
Phone: (877) 247-7640
Email: info@Para-Port.com